Information Technology · Operational Technology Business Architecture

IT/OT Technology

We transform our client’s businesses into highly automated, integrated, and digitalized operations through projects that range from high level strategic technology planning, through detailed architecture designs, to the selection, deployment and operationalization of diverse technology solutions.

Read more

Download PDF

Case 1 | Technology for a CIO

Company:

Major international mining company

Project duration:

18 months

Project description:

Our client operated two large, remote operations and engaged Vantaz to develop the technology architecture for an Integrated Operations Centre (IOC) to allow it to integrate the operations within a single city-based control centre and thereby achieve significant process improvements.

Read more

Download PDF

Case 2 | Engineering for Standardization

Company:

Important mining operation.

Project duration:

1 year

Project description:

Engineering for standardising communications in crushing and conveyor belts. The industrial communications network for crushers and conveyor belts had a logical architecture with sub-optimal physical technology and needed to be aligned with the rest of the company. This resulted in an isolated site that was not integrated with the rest of the plant’s OT services, and therefore there was a lack of compliance in different areas, including safety, remote access, and management.

Read more

Download PDF

Case 3 | Tech refresh

Company:

Important mining operation.

Project duration:

6 months

Project description:

Technological upgrade and refresher for a desalinization plant. The control system for the desalinization plant of a major mining operation had completed its life cycle and needed an update in terms of its technological solutions, with a complete review of IT/OT hardware and software. This will provide the business continuity required by the operational process.

Read more

Download PDF

Case 4 | Rogue Rogue Remotization

Company:

Important mining operation.

Project duration:

1 year, including the study and solution selection phase.

Project description:

Remote operation of rock breaker. The rock breaker operation in two important mining operations was the only process that was not undertaken in the IOC but was carried out locally in the crushers. This led to delays in processing rock jams and to risks to the health of operators. Due to this, rock breakers needed to become remotely operated in the IOC with all the necessary contingency measures to guarantee operational continuity.

Read more

Download PDF